Michigan State University

MeLCat Logo​ MeLCat Outage

Due to major system maintenance, you will not be able to request items through MeLCat beginning on November 18, 2015.  Renewals for MeLCat items will still be possible until December 2, 2015.  The system should be available for requesting again in early December.  If you are MSU faculty, student or staff, please try Uborrow.  Our community borrowers will not have access to interlibrary loan through MSU during that time. For more information, please read this MeLCat Server Migration FAQ. We apologize for the inconvenience.


Engineering Library Closing

The Engineering Library is scheduled to close permanently on Friday, December 18th, 2015.  Any changes and progress will be posted here.

Since this is an ongoing project, there will be times when the Engineering Library is noisy.  Alternatively, quiet study and group study spaces are available in the Main, Math, and Business Libraries.

Beginning Fall Semester 2015, Engineering Course Reserves will be housed in and checked out from the Main Library Reserves (the Circulation Desk on the 1st floor).

Many Engineering books and the current issues of the print journals have been moved to the Main Library.  Low-use materials will be moved to our Remote Storage facility.  Daily runs to Remote Storage allow prompt retrieval of materials.  Please see the library catalog for locations and availability. 


Black and white printing is available to our patrons during all open hours of the library. Printers are located around the corner from the circulation desk.


  • E-token Printing - This option is available to all registered faculty, staff, and students using the library owned computers. To purchase e-tokens or learn more visit: https://netprint.msu.edu/.
  • DECS Printing - Engineering students may use their printing quota by printing to the DECS printer from the DECS computers located in the library, the library laptops, and from the Engineering Collaborative Technology Labs.